EPS@ISEP | The European Project Semester (EPS) at ISEP

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
plan [2014/03/04 15:49] – created team1plan [2022/11/03 10:45] (current) – external edit 127.0.0.1
Line 1: Line 1:
-===== Project Title =====+====== Work plan ======
  
-Swimming Robot 
  
-===== Project Summary =====+===== Deadlines =====
  
-Designdevelop and implement of a biologically inspired swimming robot.+  * 2014-03-03 Choose a project proposal and send the result via email to ''epsatisep@gmail.com'' 
 +  * 2014-03-10 Define the Tasks (what must be done)Task allocation (who does what) and Gantt chart (when) of the project and insert them on the wiki (planning) 
 +  * 2014-03-26 Specify the list of material (what, quantity, where to buy - local companies are mandatory) on the wiki 
 +  * 2014-04-06 Upload the Interim Report and Presentation to the wiki; the report should contain the Introduction, including the tasks, team members allocation and Gantt chart, State of the Art, Marketing Plan, Eco-efficiency Measures for Sustainability, Ethical and Deontological Concerns, Proposed Solution and Bibliography chapters  
 +  * 2014-04-10 Interim Presentation, Discussion and Assessment 
 +  * 2014-06-12 Upload the Final Report, Presentation, Video, Paper and Poster 
 +  * 2014-06-19 Final Presentation, Individual Discussion and Assessment 
 +  * 2014-06-26:  
 +    - Update the wiki with all correction suggestions;  
 +    - Hand in CD with the corrected deliverables (source + PDF) together with all code produced to the EPS coordinator; 
 +    - Hand in one printed exemplar of the report to the EPS coordinator; 
 +    - Hand in the prototype and user manual to the client. 
 +===== Tasks =====
  
-The project requirements are: +^  TASK  ^  RESPONSIBLE TEAM MEMBER  ^ 
-  - Reuse existing components or use low cost hardware solutions + Technology and management   All (Magda 
-  - Use of open source and freeware software +|  Development of Robot´s Mechanical Architecture  |  Marcin, Magda  | 
-  - Power autonomy of 12 h + Mechanical Details  Marcin  | 
-  - Comply with the following EU Directives: +|  Electronics  Rasmus  | 
-    - Machine Directive ([[http://ec.europa.eu/enterprise/sectors/mechanical/documents/legislation/machinery/|2006/42/CE 2006-05-17]])+ Project Management   All  | 
-    - Electrical Safety: Low Level Voltage Directive ([[http://ec.europa.eu/enterprise/sectors/electrical/lvd/index_en.htm|2006/95/CE 2006-12-12]]); + Marketing Plan  |  Alicia  | 
-    - Restriction of Hazardous Substances (ROHS) in Electrical and Electronic Equipment Directive ([[http://www.rohs.eu/english/index.html|2002/95/EC 2003-01-27]]); +|  Sustainability  |  Alicia,Rasmus  | 
-  - Mandatory adoption and use of the International System of Units ([[http://physics.nist.gov/cuu/pdf/sp811.pdf|The NIST International Guide for the use of the International System of Units]]) + Ethics and Deontology  |  Magda  | 
-  - Use open source technologies. + Interim Presentation  |  AliciaMagda  
- +|  Final Presentation  |  Alicia, Magda  | 
-    + Paper  |  Magda  | 
-===== Participants ===== +|  Leaflet  Alicia  | 
- +|  Video  |  Rasmus 
-**Institution**: Instituto Superior de Engenharia do Porto +|  Poster  |  Alicia  | 
- +===== Gantt Chart ===== 
-**Group N.**: 1 +{{ :gantt_chart2.png?800 |}}
- +
-**Students**: +
-  * Alicia Moreno Ishii +
-  * Magdalena Heibeck +
-  Marcin Blazejewski +
-  Rasmus Gabriel Nybjörk +
- +
-**Panel of Supervisors**:  +
-  * Abel Duarte (ajd 'at' isep 'dot' ipp 'dot' pt) +
-  * Fernando Ferreira (fjf 'at' isep 'dot' ipp 'dot' pt) +
-  * Manuel Santos Silva (mss 'at' isep 'dot' ipp 'dot' pt) +
-  * Maria Benedita Malheiro (mbm 'at' isep 'dot' ipp 'dot' pt) +
-  * Maria Cristina Ribeiro (mcr 'at' isep 'dot' ipp 'dot' pt) +
-  * Paulo Ferreira (pdf 'at' isep 'dot' ipp 'dot' pt) +
-  * Pedro Barbosa Guedes (pbg 'at' isep 'dot' ipp 'dot' pt) +
- +
-**Client**:  +
-  * ITSector + ISEPLSA, Manuel Silva (MSS) +
-===== Contents ===== +
- +
-Project Planning: [[plan|Deadlines, Tasks, Gantt chart, Task allocation]] +
-  +
-Logbook: [[log|Weekly ReportMeetings, Activities]] +
- +
-Report: [[report|Report]] +
- +
-Deliverables: [[docs|Links to all deliverables]] +
- +
-===== Contacts ===== +
- +
-  Alicia Moreno Ishiiali_moreno@hotmail.com +
-  * Magdalena Heibeck, Magdalena.Heibeck@gmail.com +
-  * Marcin Blazejewski, mblazi0@gmail.com +
-  Rasmus Gabriel Nybjörk, rasmus.nybjork@novia.fi +
-===== Utilities ===== +
- +
-  * [[http://www.epswiki.dee.isep.ipp.pt/doku.php?id=wiki:syntaxDokuWiki Syntax]] +
-  * [[http://courses.web2teach.com/tutorial/what_is_a_wiki|Videos on how to use Wikidoku]] +
- +
-===== Acknowledgements ===== +
-  * Eng.º Vítor Costa Cerqueira, DEE, ISEP (wiki installation and management) +
-  * Prof. João Correia Lopes, DEI, FEUP (wiki template) +
- +
- --- //[[epsatisep@gmail.com|EPS@ISEP Wiki Template]] 2012/01/15 15:35//+
Print/export
QR Code
QR Code plan (generated for current page)