log [2014/05/23 10:09] – [10th Meeting (2014-05-22)] team1log [2022/11/03 10:45] (current) – external edit 127.0.0.1
Line 1: Line 1:
 ======Logbook====== ======Logbook======
 ===== Weekly Report ===== ===== Weekly Report =====
-==== 1st Week Report (CW 9) ====+==== 1st Week Report (Calendar Week (CW9) ====
 Introduction into the European Project Semester, courses, teams and proposal of projects. Discussion within the group and with coaches/professors, introduction into the workplaces and final choice of project. Introduction into the European Project Semester, courses, teams and proposal of projects. Discussion within the group and with coaches/professors, introduction into the workplaces and final choice of project.
  
Line 27: Line 27:
 ==== 10th Week Report (CW 18)==== ==== 10th Week Report (CW 18)====
 Work on final report Work on final report
 +
 +==== 11th Week Report (CW 19)====
 +Detailed product development, continue deliverables
 +
 +==== 12th Week Report (CW 20)====
 +Finish electronic circuit, Finish Marketing Plan
 +
 +==== 13th Week Report (CW 21)====
 +Work on final report
 +
 +==== 14th Week Report (CW 22)====
 +Finish final details for 3D printable parts, Finish Project Management chapter
  
 ===== Meetings ===== ===== Meetings =====
Line 247: Line 259:
     * What is the "Resit Assessment" for?     * What is the "Resit Assessment" for?
   - Questions about contact details of Supervisors (information collected for report)   - Questions about contact details of Supervisors (information collected for report)
 +=== Minute: ===
 +  - whenever supervisors Manuel and Fernando give "green light" on designs, work in the workshop can start
 +  - a better 3D printer (higher accuracy) was arranged, Fernando will forward the drawings
 +  - discussion about required shape of shaft to propel the fish, this issue will have to be experimented on the prototype
 +  - a spring, installed at the last segment of the tail fin, could maybe improve the tailmovement
 +  - an appointment was set with Fernando to improve little details on the parts in order to make them printable
 +  - the calendar on the wiki is right, google calendar had mistakes, the upload date is on 12th June
 +  - presentation can be uploaded later, one day before presentation day
 +  - contact data of professionals at ISEP can be found in ISEP Portal
  
 +==== 11th Meeting (2014-05-28) ====
 +=== Agenda: ===
 +  - Questions about list of material (concerning electrical parts)
 === Minute: === === Minute: ===
-  - whenever the supervisors Manuel and Fernando approve of drawings, work at the workshop can start +  - materials have not yet arrived 
-  - a printer with higher accuracy was arranged for us to useFernando will forward the drawings +  - there are problems with the procurement of battery and 3D prating wiresupervisors will take of that 
-  - as long as materials are not there it should be focused on all deliverables +  - 3D printing can start as soon as last technical details are discussed with Fernando and implemented into the 3D model 
-  - discussion about shaft´s shape required in order to propel the fish; will be tested on the prototype +  - the team has to buy some of the components itselftherefore some of the budget was made available for us 
-  - discussion about shaft´s material (shape memory?) +  - Video and poster can be uploaded together with presentation on 18th June 
-  - proposal to install a spring in the last tail segment (the fin) to improve motion pattern + 
-  - appointment with Fernando needs to be set up to improve little details of parts to make them printable +==== 12th Meeting (2014-06-05) ==== 
-  - calendar on wiki is correctgoogle calendar had mistakes -> deadlines are not changed +=== Agenda: === 
-  - final presentation can be uploaded later than 12th June (in time for presentation) +  - Question about content of wiki 
-  at the final hand-in date individual feedback will be provided, all team members should be present +
-  - the "Resit Assessment" is needed in case there were major mistakes in the deliverables that require correction +
-  - information about supervisors can be found in the "isep portal"+
 ==== Activities ====== ==== Activities ======
  
Line 270: Line 292:
 | 2014-03-17 | 2014-03-19 | Marketing concept | Brainstorm/Research/Discussion | all| | 2014-03-17 | 2014-03-19 | Marketing concept | Brainstorm/Research/Discussion | all|
 | 2014-03-20 |  | product development, report | the architecture was developed and components chosen, the report was prepared for the interim assessment | all | | 2014-03-20 |  | product development, report | the architecture was developed and components chosen, the report was prepared for the interim assessment | all |
 +| 2014-05-12 | 2014-06-03 | Finish technical product development | prepare the 3D model so that parts can be printed, discuss details with Fernando | Marcin |
 +| 2014-05-19 | 2014-05-31 | Finish part of Project Management for Report | elaborate all issues and send file to teacher by 31th May | Magda |
 +| 2014-05-30 | 2014-06-02 | Project Management Presentation | Prepare a commercial presentation (format based on the interim assessment) | Alicia |