log [2014/05/08 10:38] – [8th Meeting (2014-05-07)] team1log [2022/11/03 10:45] (current) – external edit 127.0.0.1
Line 1: Line 1:
 ======Logbook====== ======Logbook======
 ===== Weekly Report ===== ===== Weekly Report =====
-==== 1st Week Report (CW 9) ====+==== 1st Week Report (Calendar Week (CW9) ====
 Introduction into the European Project Semester, courses, teams and proposal of projects. Discussion within the group and with coaches/professors, introduction into the workplaces and final choice of project. Introduction into the European Project Semester, courses, teams and proposal of projects. Discussion within the group and with coaches/professors, introduction into the workplaces and final choice of project.
  
Line 27: Line 27:
 ==== 10th Week Report (CW 18)==== ==== 10th Week Report (CW 18)====
 Work on final report Work on final report
 +
 +==== 11th Week Report (CW 19)====
 +Detailed product development, continue deliverables
 +
 +==== 12th Week Report (CW 20)====
 +Finish electronic circuit, Finish Marketing Plan
 +
 +==== 13th Week Report (CW 21)====
 +Work on final report
 +
 +==== 14th Week Report (CW 22)====
 +Finish final details for 3D printable parts, Finish Project Management chapter
  
 ===== Meetings ===== ===== Meetings =====
Line 206: Line 218:
   - How can we calculate the final product costs?   - How can we calculate the final product costs?
   - Should we include European standardized tests, e.g. CE, into our product development?   - Should we include European standardized tests, e.g. CE, into our product development?
 +
 +
 +=== Minute: ===
 +  - detailed technical drawings should be handed in as soon as possible
 +    * body (back fin segments, caps, etc.)
 +    * control circuit (use 123D Circuit; 123D Apps to simulate the control circuit!)
 +  - supervisors shared their expectations
 +  - Terms of warranty should be done according to EU standards (2 years)
 +  - a user´s manual should be provided including safety instructions, also user´s videos for standard operations could be helpful
 +  - inspiration on the product packaging was given (like a sardine can?)
 +  - cost assessment
 +    * at least the costs of prototype development can be assessed (materials, design&development, production, labour cost)
 +    * ask marketing teacher about price drop down to final product
 +    * production quantity is probably required -> find reliable measures of quantities of sale or create a scenario
 +    * product costs should preferably not exceed 40€ (in Manuel´s opinion)
 +
 +==== 9th Meeting (2014-05-15) ====
 +=== Agenda: ===
 +  - when can we start working on the prototype? Are the materials here? 
 +  - present the newest design 
 +  - presentation of technical drawings
 +    * are the drawings detailed enough?
 +    * dimensions problems in some parts
 +  - presentation of electronic circuits and quick overview of electronics 
 +
 +=== Minute: ===
 +  - materials have not yet arrived
 +  - technical drawings will be discussed in another meeting appointed with Manuel
 +  - architecture of tail was discussed, especially methods to create a streamline surface, a solution is not yet found
 +  - different materials to create the streamline were discussed, e.g. neoprene, mylar, dacron
 +  - pins to connect tail segments should be made of stainless steel rather than plastics
 +
 +==== 10th Meeting (2014-05-22) ====
 +=== Agenda: ===
 +  - Presentation of current Mechanical Design
 +  - Questions about EPS Calendar:
 +    * Upload of final deliverables already at the 8th June??
 +    * Does the presentation also need to be done by then?
 +    * Do all team members need to be present at the final hand-in date (19th June)?
 +    * What is the "Resit Assessment" for?
 +  - Questions about contact details of Supervisors (information collected for report)
 +=== Minute: ===
 +  - whenever supervisors Manuel and Fernando give "green light" on designs, work in the workshop can start
 +  - a better 3D printer (higher accuracy) was arranged, Fernando will forward the drawings
 +  - discussion about required shape of shaft to propel the fish, this issue will have to be experimented on the prototype
 +  - a spring, installed at the last segment of the tail fin, could maybe improve the tailmovement
 +  - an appointment was set with Fernando to improve little details on the parts in order to make them printable
 +  - the calendar on the wiki is right, google calendar had mistakes, the upload date is on 12th June
 +  - presentation can be uploaded later, one day before presentation day
 +  - contact data of professionals at ISEP can be found in ISEP Portal
 +
 +==== 11th Meeting (2014-05-28) ====
 +=== Agenda: ===
 +  - Questions about list of material (concerning electrical parts)
 +=== Minute: ===
 +  - materials have not yet arrived
 +  - there are problems with the procurement of battery and 3D prating wire, supervisors will take of that
 +  - 3D printing can start as soon as last technical details are discussed with Fernando and implemented into the 3D model
 +  - the team has to buy some of the components itself, therefore some of the budget was made available for us
 +  - Video and poster can be uploaded together with presentation on 18th June
 +
 +==== 12th Meeting (2014-06-05) ====
 +=== Agenda: ===
 +  - Question about content of wiki
 +
 ==== Activities ====== ==== Activities ======
  
Line 215: Line 292:
 | 2014-03-17 | 2014-03-19 | Marketing concept | Brainstorm/Research/Discussion | all| | 2014-03-17 | 2014-03-19 | Marketing concept | Brainstorm/Research/Discussion | all|
 | 2014-03-20 |  | product development, report | the architecture was developed and components chosen, the report was prepared for the interim assessment | all | | 2014-03-20 |  | product development, report | the architecture was developed and components chosen, the report was prepared for the interim assessment | all |
 +| 2014-05-12 | 2014-06-03 | Finish technical product development | prepare the 3D model so that parts can be printed, discuss details with Fernando | Marcin |
 +| 2014-05-19 | 2014-05-31 | Finish part of Project Management for Report | elaborate all issues and send file to teacher by 31th May | Magda |
 +| 2014-05-30 | 2014-06-02 | Project Management Presentation | Prepare a commercial presentation (format based on the interim assessment) | Alicia |