| - | ==== 1st Week Report (CW 9) ==== | + | ==== 1st Week Report |
| Introduction into the European Project Semester, courses, teams and proposal of projects. Discussion within the group and with coaches/ | Introduction into the European Project Semester, courses, teams and proposal of projects. Discussion within the group and with coaches/ | ||
| Line 27: | Line 27: | ||
| ==== 10th Week Report (CW 18)==== | ==== 10th Week Report (CW 18)==== | ||
| Work on final report | Work on final report | ||
| + | |||
| + | ==== 11th Week Report (CW 19)==== | ||
| + | Detailed product development, | ||
| + | |||
| + | ==== 12th Week Report (CW 20)==== | ||
| + | Finish electronic circuit, Finish Marketing Plan | ||
| + | |||
| + | ==== 13th Week Report (CW 21)==== | ||
| + | Work on final report | ||
| + | |||
| + | ==== 14th Week Report (CW 22)==== | ||
| + | Finish final details for 3D printable parts, Finish Project Management chapter | ||
| ===== Meetings ===== | ===== Meetings ===== | ||
| Line 204: | Line 216: | ||
| * Costs of usage and maintenance | * Costs of usage and maintenance | ||
| - Where does a chapter on the final product fit best in the report? | - Where does a chapter on the final product fit best in the report? | ||
| - | - How can we calculate the product costs? | + | - How can we calculate the final product costs? |
| + | - Should we include European standardized tests, e.g. CE, into our product development? | ||
| + | |||
| + | |||
| + | === Minute: === | ||
| + | - detailed technical drawings should be handed in as soon as possible | ||
| + | * body (back fin segments, caps, etc.) | ||
| + | * control circuit (use 123D Circuit; 123D Apps to simulate the control circuit!) | ||
| + | - supervisors shared their expectations | ||
| + | - Terms of warranty should be done according to EU standards (2 years) | ||
| + | - a user´s manual should be provided including safety instructions, | ||
| + | - inspiration on the product packaging was given (like a sardine can?) | ||
| + | - cost assessment | ||
| + | * at least the costs of prototype development can be assessed (materials, design& | ||
| + | * ask marketing teacher about price drop down to final product | ||
| + | * production quantity is probably required -> find reliable measures of quantities of sale or create a scenario | ||
| + | * product costs should preferably not exceed 40€ (in Manuel´s opinion) | ||
| + | |||
| + | ==== 9th Meeting (2014-05-15) ==== | ||
| + | === Agenda: === | ||
| + | - when can we start working on the prototype? Are the materials here? | ||
| + | - present the newest design | ||
| + | - presentation of technical drawings | ||
| + | * are the drawings detailed enough? | ||
| + | * dimensions problems in some parts | ||
| + | - presentation of electronic circuits and quick overview of electronics | ||
| + | |||
| + | === Minute: === | ||
| + | - materials have not yet arrived | ||
| + | - technical drawings will be discussed in another meeting appointed with Manuel | ||
| + | - architecture of tail was discussed, especially methods to create a streamline surface, a solution is not yet found | ||
| + | - different materials to create the streamline were discussed, e.g. neoprene, mylar, dacron | ||
| + | - pins to connect tail segments should be made of stainless steel rather than plastics | ||
| + | |||
| + | ==== 10th Meeting (2014-05-22) ==== | ||
| + | === Agenda: === | ||
| + | - Presentation of current Mechanical Design | ||
| + | - Questions about EPS Calendar: | ||
| + | * Upload of final deliverables already at the 8th June?? | ||
| + | * Does the presentation also need to be done by then? | ||
| + | * Do all team members need to be present at the final hand-in date (19th June)? | ||
| + | * What is the "Resit Assessment" | ||
| + | - Questions about contact details of Supervisors (information collected for report) | ||
| + | === Minute: === | ||
| + | - whenever supervisors Manuel and Fernando give "green light" on designs, work in the workshop can start | ||
| + | - a better 3D printer (higher accuracy) was arranged, Fernando will forward the drawings | ||
| + | - discussion about required shape of shaft to propel the fish, this issue will have to be experimented on the prototype | ||
| + | - a spring, installed at the last segment of the tail fin, could maybe improve the tailmovement | ||
| + | - an appointment was set with Fernando to improve little details on the parts in order to make them printable | ||
| + | - the calendar on the wiki is right, google calendar had mistakes, the upload date is on 12th June | ||
| + | - presentation can be uploaded later, one day before presentation day | ||
| + | - contact data of professionals at ISEP can be found in ISEP Portal | ||
| + | |||
| + | ==== 11th Meeting (2014-05-28) ==== | ||
| + | === Agenda: === | ||
| + | - Questions about list of material (concerning electrical parts) | ||
| + | === Minute: === | ||
| + | - materials have not yet arrived | ||
| + | - there are problems with the procurement of battery and 3D prating wire, supervisors will take of that | ||
| + | - 3D printing can start as soon as last technical details are discussed with Fernando and implemented into the 3D model | ||
| + | - the team has to buy some of the components itself, therefore some of the budget was made available for us | ||
| + | - Video and poster can be uploaded together with presentation on 18th June | ||
| + | |||
| + | ==== 12th Meeting (2014-06-05) ==== | ||
| + | === Agenda: === | ||
| + | - Question about content of wiki | ||
| ==== Activities ====== | ==== Activities ====== | ||
| Line 214: | Line 292: | ||
| | 2014-03-17 | 2014-03-19 | Marketing concept | Brainstorm/ | | 2014-03-17 | 2014-03-19 | Marketing concept | Brainstorm/ | ||
| | 2014-03-20 | | product development, | | 2014-03-20 | | product development, | ||
| + | | 2014-05-12 | 2014-06-03 | Finish technical product development | prepare the 3D model so that parts can be printed, discuss details with Fernando | Marcin | | ||
| + | | 2014-05-19 | 2014-05-31 | Finish part of Project Management for Report | elaborate all issues and send file to teacher by 31th May | Magda | | ||
| + | | 2014-05-30 | 2014-06-02 | Project Management Presentation | Prepare a commercial presentation (format based on the interim assessment) | Alicia | | ||